-
Global
-
Africa
-
Asia Pacific
-
Europe
-
Latin America
-
Middle East
-
North America
- |
- Partners
- |
- SPS Blog
- |
- Contact Us
- |
-
Software
Software
-
Automation
Automation -
Productivity
Productivity -
Safety
Safety
-
-
Services
Services
-
Automation
Automation -
Productivity
Productivity -
Safety
Safety
-
-
Industries
Industries
-
Healthcare and Life Sciences
Healthcare and Life Sciences -
Transportation and Logistics
Transportation and Logistics -
Manufacturing
Manufacturing -
Distribution Centers
-
Retail
Retail -
E-Commerce
-
Infrastructure
Infrastructure -
Government
Government -
Aerospace and Defense
-
-
Support
Support
-
Advanced Sensing Technologies
Advanced Sensing Technologies-
Sales Contact Form
-
Technical Support
-
Certificates
-
Training
-
Global Locations
-
Blog
-
Return Material Authorization (Test & Measurement)
-
Return Material Authorization (Citytech)
-
Return Material Authorization (EnviteC)
-
eCOM Portal
-
Distributor Inventory
-
Materials Safety (Citytech)
-
Instructions for Safe Use (Citytech)
-
Cross Reference List (EnviteC)
-
-
Automation
Automation -
Productivity
Productivity -
Safety
Safety
-
- Support
- Automation
- Resources
- White Papers
- Optimize the Performance of Your Critical Path for Operational Success
Optimize the Performance of Your Critical Path for Operational Success
A critical path is defined as a portion or subset of a material handling equipment (MHE) system and its associated components that are essential to the efficient and effective performance of a distribution and fulfillment (D&F) operation. Simply put, a critical path is a system or subsystem without which your operation simply cannot survive. A common example includes the coordination of sortation, induction, merge and accumulation conveyors. Performance optimization consulting (POC) is a targeted lifecycle management process through which an MHE vendor analyzes a critical path’s current operation and makes improvements to maximize its throughput and efficiency. This process starts by assessing the existing critical path’s MHE components. It includes a review of current business requirements (package sizes, throughput, customer service levels, etc.), conducts system-specific enhancements and improvements, and concludes by establishing a new performance baseline.
Once the POC process is completed, internal maintenance and MHE vendors can then work to support this new performance baseline. This paper will detail a three-step POC process that can be used to deliver performance improvements on the most important system within a D&F operation.
Download our white paper to learn exactly how these strategies can increase throughput in your operation.
Let's Connect!
Sign up to receive exclusive communications from Honeywell including product updates, technical information, new offerings, events and news, surveys, special offers, and related topics via telephone, email, and other forms of electronic communication.
Copyright © 2023 Honeywell International Inc